What are the operating specifications after the wire drawing machine is installed and debugged?
1. Before sending power, check whether the power terminals in the control box are locked.
2. Check whether the parts of the wire drawing machine are damaged or loose during the handling process.
3. Remove the movable top center and nut of the coiling shaft.
4. First use the foot switch to do the inching operation to check whether the transmission mechanisms of the wire drawing machine are smooth.
When the foot switch is used for threading, the operator clicks the foot switch to make the wire drawing machine run at low speed. When abnormal conditions such as disordered lines occur during production operation, you can step on this switch to stop the machine in an emergency.
5. Place the buffer pendulum at the low position. (Leaving the low detection position, the machine will stop when it is judged to be disconnected at the low position)
6. Set the starting speed of the wire drawing machine, first set 50-100 meters, start the machine and then slowly increase the speed to high speed.
7. After slow start, observe the normal operation of each part before accelerating.
8. Because there is no actual winding operation, the speed of the winding shaft cannot be controlled. Depending on the position of the buffer pendulum, it will reach a high speed in a short period of time or slowly decelerate to a standstill.
9. Check whether the line speed, slippage, and meters displayed on the screen of the wire drawing machine are normal.
10. The machine stops after about 1 hour of empty running.