What is the operating process of the wire drawing machine?
Preparation before startup
Check whether all parts of the equipment are normal, such as the reel, mold, transmission parts, electrical system, etc.
Ensure that the quality and specifications of raw materials meet the requirements.
Prepare the necessary tools and measuring tools.
Installing the mold
Select the appropriate wire drawing die and install it correctly on the die seat to ensure it is tightened.
Threading
Pass the raw material threads through the various reels and molds, taking care to keep the threads neat and stable.
Setting process parameters
According to production requirements, set the drawing speed, tension, drawing times and other process parameters.
Start-up test run
Start the equipment and conduct a short trial run to observe whether the equipment runs smoothly and whether there are any abnormal sounds or vibrations.
Formal drawing
After confirming that the equipment is operating normally, start formal wire drawing production, and pay attention to monitoring parameter changes during the wire drawing process.
quality inspection
Regularly sample the drawn products to check whether the diameter, surface quality, mechanical properties, etc. meet the standards.
Adjustment parameters
According to the quality inspection results, if necessary, adjust the process parameters in time to ensure product quality.
Shutdown Operation
After completing the production task, stop wire drawing first and then turn off the power of the equipment.
Cleaning and maintenance
Clean metal chips, oil stains, etc. on the surface of the equipment and perform necessary maintenance on the equipment.
If you have any needs or still have some doubts, you can contact Wandeshun Machine for consultation. Wandeshun Machine will arrange professionals to answer one-on-one.