According to the first to the machine base foot hole, using an appropriate expansion screws in the cement on the basis of a pre-tied, to secure it together. Then check whether the equipment can maintain a stable state, and whether all auxiliary equipment is complete. When tightening the equipment, pay attention to adjusting the position of the host to ensure that the center of the reel and the turning center of the trolley are at the same position. Also note that the adjustment of the host, they should ensure that car in the process of moving back and forth can be maintained smooth. In addition, the need to follow the requirements of electricity and reasonable electrical lines connect the device to ensure that no leakage, short circuit. After the installation is complete, debugging is followed. Prior to this, we need to check the installation is complete, and check each bolt well. After the internal vertical wire drawing machine and then further down into the amount gearbox oil, while the center position of the view through the inspection to ensure the appropriate height. In addition, care should be taken to ensure that there is no oil leakage in the reducer case. After it is unloaded at start, this time running state should pay attention to see if it can be kept stable, whether there will be a large noise or vibration problems is obvious. During the load operation empty, try to manipulate various control buttons to control the machine starts normal operation, stop, and other actions. The inverted wire drawing machine is relatively simple in the overall operation, so there is basically no noise during the operation, and the control system is simple and reliable, so the entire production process is very safe , The main thing is that routine maintenance is more convenient. Whether the different lubrication points of the inverted wire drawing machine are completely lubricated, whether the pressure of the water path and the air path are normal, and whether the wire drop frame on the trolley is complete; after the power supply of the equipment is connected, the AC main motor is turned on, and then ensure The inverted wire drawing machine can run without load for a period of time, which is convenient for detailed inspection of the equipment; for the host in the inverted wire drawing machine, it should be started slowly, and then it can be gradually increased in speed to reach normal operation speed.
https://www.chinawiredrawingmachine.com/







